Hotelling’s Rule Verification of a Mining Project

Pricope Sorin *

University of Petroșani, Petroșani, Romania.

*Author to whom correspondence should be addressed.


Abstract

On the basis of a real (confidential) mining project data the Hotelling’s rule fitting is verified and a new production schedule is proposed, which better fulfill the Hotelling rate rule than the previously program published by the investor. The intertemporal influences in project duration period are analyzed.


How to Cite

Sorin, Pricope. 2020. “Hotelling’s Rule Verification of a Mining Project”. Current Journal of Applied Science and Technology 39 (14):55-59. https://doi.org/10.9734/cjast/2020/v39i1430700.

Downloads

Download data is not yet available.